Spirit of tasmania

Spirit of Tasmania Berth Redevelopment, Devonport

Geotas has been working on the Spirit of Tasmania Berth Redevelopment at Devonport as a subcontractor to BMD Constructions, the principal contractor, for TT-Line. Our scope covered three areas of the site: barrier installation and the sitewide gate systems and energy absorbing bollard systems.

On the barrier side, we managed guardrail installation compliance across three locations at the terminal: the passenger entry, the freight yard entry and the lower freight exit. The works included steel W-beam guardrail with trailing and crash-rated terminals, eight lines in total with 12 terminations. We documented each run and termination and compiled the compliance report for submission to the client ensuring every element was installed to specification.

The gate scope was more complex. The site has 16 automated gates using different drive systems, including sliding, swing and bifold gates, boom gates and turnstiles. Each of these gate types required their own fail safe systems to allow for continued safe operation even in a power failure event, and each needed its own safety sensor installed and programmed which was done by our in-house security team. One of the gates installed was a sliding gate that cantilevered 11m over the road, another was a double Bi-fold gate with an 8m opening, another still was the nearly 13m opening double swing Mesh security gate.

Throughout the project, Geotas has focused on practical, compliant outcomes that the client can sign off with confidence.

All Projects

  • Black Palisade Fence running behind a "Spirit of Tasmania" sign

    Spirit of Tasmania – September 2026

    Geotas has been working on the Spirit of Tasmania Berth Redevelopment at Devonport as a subcontractor to BMD Constructions, the principal contractor, for TT-Line

    View Project
  • Copping Landfill – July 2025

    View Project
  • New Bridgewater Bridge – May 2025

    Geotas played a key role in the New Bridgewater Bridge project, delivering specialist civil works and supporting the safe, efficient construction of one of Tasmania’s largest transport infrastructure upgrades. As part of a collaborative effort, Ozguard installed the guardrail systems, AB Contracting was responsible for the installation of signage and security fencing, and CFS completed all bike and pedestrian fencing. Together, these contributions have helped ensure the new bridge meets the highest standards of safety and accessibility for all users.

    View Project
  • Geofabrics Seminar – July 2024

    Over 3 days and as many locations Craig of Geotas in partnership with Rajesh, Abid, and Dale from Geofabrics presented on the wide range of solutions they can provide together. Engineers and Supervisory Staff were invited along to either Hobart, Launceston, or Devonport and were treated to a suite of presentations illustrating geofabrics and their benefits in Road Design, Maintenance and Construction.
    The trio of speakers provided deep dives into relevant topics like pavement stabilisation solutions, rockfall protection and mitigation, subsoil drainage, as well as a look at some of the software they can provide to assist at the design stage.

    View Project
  • Bridge Barrier – July 2023

    Working with OzGuard, our permanent subcontractor for safety barriers, and Hazell Bros, the Principal, we installed high containment bridge barrier over the Rubicon River Bridge and Wallaby Creek Bridge. This robust system was installed as part of a project to bring outdated road safety systems up to the current standards.

    View Project
  • CrocGuard – March 2023

    The installation of the CrocGuard® bridge and culvert barrier system on the Midlands Hwy Ross section. This revolutionary system features a unique composite design that transfers impact loads to the posts at each abutment, providing outstanding durability and resistance to damage from vehicle impacts. CrocGuard® is ideal for use on weak bridge decks or culverts where conventional post and rail barriers may not be suitable. As posts could not be driven in this section due to the culvert below, Safe Direction’s CrocGuard was the obvious choice.

    View Project